Unit trip: Callide A and B, QLD (2021-07-06)
Power Station: Callide A and B
Unit: CALL_B_1
Generation lost: 349 MW
Time: 2021-07-06 10:25:00
Power Station: Callide A and B
Unit: CALL_B_1
Generation lost: 349 MW
Time: 2021-07-06 10:25:00